The first body is now out the mould, trimmed and outside for the photo shoot!!!!!! It has turned out better than we ever imagined and we are completely blown away by it!! We just hope everybody else is and we get a few orders!! The body is going up to MNR at the weekend after the the Donington races, so if you fancy a sneak peek come along to donington on sunday
Showing posts with label GM3. Show all posts
Showing posts with label GM3. Show all posts
Friday, 28 June 2013
Thursday, 13 June 2013
Mould finished!!!!!!
Ahead of schedule the mould was popped off today!!!!! Excited isn't the word!!!
Hopefully we should have the first body out in 2 weeks time!!
Hopefully we should have the first body out in 2 weeks time!!
Wednesday, 12 June 2013
Plug Finished
The plug was finally finished with all the fences added to create the mould split lines. It then had to be transported 1 mile up the road to the mould shop. To do this das trusty trailer was stripped down to the bare chassis and with the use of jacks, blocks, rollers and a brother-in-law it was loaded on and strapped down.
The large roofing bolts are added on the fences are to create locating plugs in the mould, the mould is laid over the fence and bolt head, the fence is then removed and the next part of the mould is laid up against the GRP, the shape of the bolt heads is built in so you get a locating dimple when you bolt the moulds together.
The plug is still up at the mould shop but should be finished next week, here are some progress shots of the mould being made
The large roofing bolts are added on the fences are to create locating plugs in the mould, the mould is laid over the fence and bolt head, the fence is then removed and the next part of the mould is laid up against the GRP, the shape of the bolt heads is built in so you get a locating dimple when you bolt the moulds together.
The plug is still up at the mould shop but should be finished next week, here are some progress shots of the mould being made
Thursday, 25 April 2013
Stoneleigh pre show prep
As the bodywork won't be ready for the show, the next best thing is some large art work, so after a friends hard work we have a blinged up MNR GM3
Monday, 22 April 2013
Pre mould making photos
The body is off to the mould shop in he next few days so i thought we'd get a few photos of it out doors before it goes. The daylight has shown a few areas that need slight attention before it goes, but overall its looking pretty damn fine!!! You'll notice at the rear the tunnel like shape exiting the rear panel, this will give an option to create a venturi style tunnel at rear if required, but in RGB this isn't permitted so will be full enclosed by the floor and just a visual feature.